Departure readiness
Every planned departure electronically verifies its required controls
MV Kanawan, departure readiness
๐ข Cleared to sail
Departure authorised 09:57
Vessel
- โNo unresolved critical defectsEvidence: Defect register, 0 open critical
- โRequired maintenance completedEvidence: WO-3341 closed 16 Aug 19:20
- โMachinery checks completedEvidence: Pre-departure inspection 09:41
- โNavigation systems operationalEvidence: Bridge systems test 09:33
Safety
- โLife-saving equipment verifiedEvidence: 820 life jackets serviceable
- โFire equipment verifiedEvidence: Pumps & hoses tested 09:38
- โEmergency communications operationalEvidence: VHF + sat test 09:39
- โSafety equipment inspections currentEvidence: Liferaft service 11 Jun
Crew
- โRequired complement satisfiedEvidence: 11 / 11
- โMaster assignedEvidence: A. Persaud
- โEngineer assignedEvidence: D. Singh
- โCertifications validEvidence: 11 / 11 current
- โDuty requirements satisfiedEvidence: Rest hours compliant
- โFitness compliance satisfiedR. Ramkissoon declaration expires 18 Aug, blocks 13:30 assignment
Passengers & Load
- โFerryPass ticketing closedEvidence: Closed 09:48
- โBoarding validation completedEvidence: 423 scanned
- โManifest reconciledEvidence: FerryPass 423 / validation 423, 09:51
- โPassenger capacity compliantEvidence: 423 / 800
- โVehicle/cargo limits compliantEvidence: 41 / 44
- โVehicle securing confirmedEvidence: 41 / 41 verified by Bosun
Evidence & Logs
- โPre-departure inspection submittedEvidence: 09:41, 34/34 checks
- โEngineering log reviewedEvidence: Reviewed 12:11
- โRequired supporting evidence attachedEvidence: 4 attachments
Authorisations
- โChief Engineer sign-offEvidence: D. Singh 09:41
- โMaster sign-offEvidence: A. Persaud 09:54
- โShore-side review completeEvidence: R. Ferreira 09:53