Fleet
  • Active vessels7
  • Underway4
  • Alongside2
  • Unavailable1
People currently aboard
  • Passengers aboard1,286
  • Crew aboard73
Today's operations
  • Voyages completed18
  • Underway4
  • Upcoming3
Safety
  • Critical exceptions1
  • Warnings3
  • Departures blocked0

Live fleet, Guyana ferry network

Expected versus actual voyage progress, continuously assessed

7 vessels tracked
Map of Guyana's coastline and river network
MV Kanawan
Underway
Parika → Supenaam
8.2 kn | ETA 11:17
On course ✓
11 / 11 REQUIRED

Executive action

Direct control. Every action is recorded and auditable.

My attention

What needs the Chairwoman's awareness, decision or intervention

1
Decision required
1
Critical defect
1
Restrictions in force
1
Overdue SITREP
2
Overdue actions
2
Stelling issues
CriticalMaintenance defect
08:42

MV Malali, Steering system defect unresolved

  • Steering pump #2 hydraulic pressure loss confirmed during post-voyage inspection.
  • Return to service BLOCKED pending independent engineering assessment.
Owner
Marine Engineering, R. Ferreira
Status
ACTION UNDERWAY
Action
Independent assessment instructed by Chairperson (due 16:00)
Open defect & component history
WarningVoyage progress
11:04

MV Sabanto, 47 minutes behind expected voyage progress

  • Port engine load capped at 55% by Chief Engineer (fuel filter differential high).
  • Last vessel position received 2 mins ago. Bartica stelling advised of revised ETA 13:22.
Owner
Operations, Duty Controller
Status
MONITORING
Action
Operations contacted vessel; revised ETA issued to stelling
Open Vessel 360, machinery
WarningMachinery
12:19

MV Kalliopi N, Starboard coolant temperature above threshold, 91°C

  • Threshold 90°C. Cooling intake pressure declining (1.4 bar vs 2.0–2.3 nominal).
  • Raised automatically from 12:19 SITREP abnormal observation. Engineering crew notified 12:20.
Owner
Marine Engineering, on-watch
Status
MONITORING
Action
Starboard load reduced to 60%; hourly reporting instructed
Open originating SITREP
WarningStelling

PARIKA STELLING, Berth 2 ramp operating intermittently

Hydraulic ramp cycling inconsistently under vehicle load. Vehicle loading is being handled through Berth 1 while engineering attends. Reported 14:42 by Stelling Supervisor.

View CCTVOpen Dock360
WarningStelling

PARIKA STELLING, Heavy vehicle congestion on approach road

74 vehicles waiting, estimated processing time 38 minutes. Queue extends beyond the marshalling area. Reported 15:05 by Stelling Supervisor.

View CCTVOpen Dock360
  • MV MalaliCTRL-0081
    Return to service blocked
    Release: Independent engineering assessment and authorised return to service review
  • MV SabantoRES-0042
    Maximum 55% port engine load
    Until Engineering inspection and pressure test completed
  • MV Malali, Steering Pump #2Steering system, hydraulic pressure lossBLOCKED
  • MV Kanawan, Fire Pump #1Low output pressureNOT AFFECTED
  • MV Sabanto, Port fuel filter assemblyDifferential pressure high, load restriction appliedRESTRICTED, 55% port load
  • MV Kalliopi N, Starboard sea water coolingCoolant temperature above threshold, intake pressure decliningMONITORING
Open maintenance register →
0 departures blocked by systemCleared to sail register →